Everything You Always Wanted to Know About Stand-By Losses (But Were Afraid to Ask) has been written in this 100 page Book !
download :
SELINA_book.pdf
Action plan for market transformation for various types of stakeholders
download :
SELINA_WP5_D5.3_final.pdf
National workshops with stake-holders minutes and conclusions
download :
SELINA_WP5_D5.2_Fraunhofer_ISI_November2010_final.pdf
SELINA : Short overview of the the National Workshops (Article)
download :
SELINA_WP6_D6_A3.pdf
A Short Summary of the SELINA Project (article)
download :
SELINA_WP6_D6_A2.pdf
Consumer Guide on Standby Power
This 8 pages Consumer Guide starts by answering questions such as "What are standby energy losses?", "Why is standby power important" and "What is the European Commission doing?". Next, practical guidelines on equipment selection and operation for different types of equipment are given. State-of-the-art data is used, such as standby power measured during the SELINA project.
download :
Consumer Guide on Standby Power.pdf
(Inter)national activities for consumer information on electricity consumption of appliances
This report, written by the Fraunhofer Institute (FhG) ISI, identifies and analyses relevant stakeholders and frame conditions, including an analysis of the role of relevant stakeholders analysis and an analysis the frame conditions for efficiency improvements (consumer behaviour, barriers and obstacles).
download :
SELINA_WP5_D5.1_final.pdf
Report on Measurements of Standby Losses in Shops
In any shop or factory in the 12 European countries participating in the SELINA Project, the measurement campaign is now finished. In total, 6000 appliances have been measured. The data have been analysed by ARMINES- Mines ParisTech
download :
Measurements of standby energy losses in new equipment.pdf
Report on retailers awareness
During the SELINA project large periods of time were spent in shops doing measurements. This was an opportunity to gather other information : the retailers role in the decision to purchase (energy efficient) appliances. To answer to these question, it was decided to perform retailers interviews, where each salesman had to answer to a questionnaire. The results of these survey are analysed by ARMINES in a report.
download :
Report on retailers awareness.pdf
IEA-APP-EU International Standby Power Workshop - Vienna, 2 March 2010
The IEA-APP-EU International Standby Power Workshop was held in Vienna, Austria, 2 March 2010.
Final Program (584 kB)
Workshop Recommendations (92 kB) - Open for Comment until 31 March 2010 to either Melissa Damnics or Carlos Patrao.
Workshop Overview and Recommendations (884 kB)
Welcome
Coffee Break
Lunch
Coffee Break
Press Release SELINA November 2009
download :
Press_Release_SELINA_November2009.pdf